Missouri Bids > Bid Detail

SPIRE MISSOURI INC. GAS LINE RELOCATION

Agency: DEPT OF DEFENSE
Level of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD00159729094763914
Posted Date: May 18, 2023
Due Date: Jun 1, 2023
Solicitation No: W912P923R0016
Source: https://sam.gov/opp/d2c2b3b170...
Follow
SPIRE MISSOURI INC. GAS LINE RELOCATION
Active
Contract Opportunity
Notice ID
W912P923R0016
Related Notice
W912P923R0016
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
MVD
Office
W07V ENDIST ST LOUIS
General Information
  • Contract Opportunity Type: Special Notice (Original)
  • All Dates/Times are: (UTC-05:00) CENTRAL STANDARD TIME, CHICAGO, USA
  • Original Published Date: May 18, 2023 04:25 pm CDT
  • Original Response Date: Jun 01, 2023 10:00 am CDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date:
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1NA - CONSTRUCTION OF FUEL SUPPLY FACILITIES
  • NAICS Code:
    • 237120 - Oil and Gas Pipeline and Related Structures Construction
  • Place of Performance:
    Hazelwood , MO 63042
    USA
Description

USACE St Louis District intends to sole source the following action, in accordance with FAR 6.302-1.



Relocate a 16 in. diameter SF natural gas line main from the North side of McDonnell Blvd. to the South side of McDonnell Blvd. Remediation will be performed at the McDonnell Bridge over Coldwater Creek and at McDonnell Blvd. from the east end parking lot entrance of the Guest, Keen & Nettlefolds (GKN) Aerospace North America Inc. to the intersection of Eva Road and McDonnell Blvd. The St. Louis County, Missouri, agreed to provide a road closure to facilitate the remediation effort at and around the bridge over Coldwater Creek and along this alignment of McDonnell Blvd. This natural gas line is owned and controlled by SPIRE Missouri, Inc.



A more concise description on the relocation of the 16-inch diameter steel main will be as follows:



Install 4,410 linear feet of 16 in. Steel (ST) SF Main on the South side of James S. McDonnell Blvd.



Install 110 linear feet of 8 in. ST SF Main and Install 180 linear feet of 2 in. ST SF Main



along the south side of James S. McDonnell Blvd. Abandon 3,910 linear feet of 16 in. ST SF Main



and 95 linear feet of 8 in. ST SF Main along the north side of James S. McDonnell Blvd.



SPIRE Missouri Inc. has indicated that it will require a seven-month duration. It includes but is not limited to procurement of material, site preparation, field work, installation, and abandonment of pipe.


Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING DIVISION 1222 SPRUCE STREET
  • SAINT LOUIS , MO 63103-2833
  • USA
Primary Point of Contact
Secondary Point of Contact
History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >